There was a lot of cutting and odd angles, had me worried at first but it went really well and took quite a bit less time than I thought it would. The painting actually took longer than building the trusses and beams.
I think this work turned out awesome. The client is very happy with the result of her "Vision"
This was a very plain stippled(popcorn) ceiling a couple of weeks ago.
Design/Build, Kitchens, Bathrooms, Renovations, Decks, Basements. From Design Build to Renovating Living Spaces
Friday, 30 November 2012
Saturday, 17 November 2012
New job in Vaughan, Make My Room Cottage Like
This was a plain vaulted and stippled ceiling. We cut LVL lumber and placed them on walls to support and will be installing tougue and groove bead boards on the ceiling. Boxing in beams with MDF and painting to come as well.
We really want to get this done quickly so our client can enjoy a great Christmas in the new family room. It's already Nov 17th
So far the customer feedback has been very nice!!!!
We really want to get this done quickly so our client can enjoy a great Christmas in the new family room. It's already Nov 17th
So far the customer feedback has been very nice!!!!
Sunday, 28 October 2012
Turning a Hot Tub Room into an Art Studio
new vanity, granite, taps, mirror, laminate and trim
added a stainless sink and taps to the countertop
new laminate, base and crown trim and lighting, fresh paint too
added a stainless sink and taps to the countertop
new laminate, base and crown trim and lighting, fresh paint too
Project Completed, Backsplash and Painting Complete
Hickory Cabinets Manufactured by Big Sound Woodworks and installed by PureBuilt. Quartz Countertops Supplied and Installed by Continental Granite in Bolton
more High Park updates
I couldn't believe how the foam made the wall so solid, built in moisture barrier and soundproof too
range exhaust duct, straight outside
porcelain tiles on hardie board
the service is ripped out from here and goes to the opposite end of the house
ongoing Kitchen work, wall gone and beam in place
triple LVL beam on two columns, block wall below filled with mortar and blocking fills the joist cavities