Friday, 11 November 2011

Recent Work in Oct and Nov, Replace siding, Rebuilt Porch, New Piers, Replace Sign Posts, Caps and Details

We tore off old weathered siding and replaced it with Exterior Fir Plywood and New Flashing

We replaced the weathered lattice and put in new concrete pier blocks on existing footings, parged and painted with aluminum caps to shed water


Replaced Lattice and Framework and new Concrete Piers

Dug up old rotten posts and replaced with cedar and pine trim. It was to be painted but the owner loved the look and wants us to clear treat it

Thursday, 20 October 2011

We're working on a Retail Store opening soon in Aurora called The Gown







Entry Way to The Gown

Hallway From Outside

I think Shannon was undecided if we should tear out the Slat-Wall but I think I nudged her a bit!!!




http://www.thegown.ca/
Opening mid Nov, We did some Hardwood Flooring, Panelled the entryway and stairs, a couple of new walls, drywall and taping, new 5-1/2" baseboard and had a friend build 3-beautiful Wardrobes out of solid oak and oak veneered plywood, set for installation next Wed.
Pics coming soon

We're working on another set of stairs, solid oak, 18 treads, 3-Newell Posts and 21 risers






Solid Oak Treads With Return Nosing and Solid Oak Risers

Stroke Sander back in operation, what a great tool. 280Inch belt, I can sand a 48"x 108" table top with it




Saturday, 10 September 2011

New Hardwood Flooring and a Staircase Remodel, what a change!!!!








All the Little things really added up in time. Chalk this one up to Great Experience!!!!

Can't figure out how to rotate image, source file is ok
All the Ballisters were hand chopped into the treads, the tops were bevel cut and countersink screws hold them in


Newell Posts were replaced because we couldn't strip the stain without damaging the turned profile. Notice the solid Oak Shelf, Kerf Cut and Bent, and segmented cut floor pieces on top. Hate to count the hours!!!