Heating Piping relocated and updated
This is a solid brick house, no insulation at all, well, tar paper, foil backed plaster lath R 1 maybe
this was the kitchen
this wall is coming out
block support wall in the basement
Design/Build, Kitchens, Bathrooms, Renovations, Decks, Basements. From Design Build to Renovating Living Spaces
Sunday, 28 October 2012
Tuesday, 21 August 2012
Monday, 18 June 2012
New Neo-Angle, Tiled and Glass Wall Shower
ripped out an old tile shower and rebuilt it using hardie backer board, kerdie membrane and bottom pan and drain kit. Grouted and waiting for the Glass Order to be ready
Friday, 25 May 2012
New Cedar Top on and old deck
half of the unseen structure needed to be replaced, dry rot, carpenter ants and wet
we installed Grace Waterproof membrane on all joist tops to shed water and help preserve the deck joists
we installed Grace Waterproof membrane on all joist tops to shed water and help preserve the deck joists
Thursday, 3 May 2012
Ensuite Bathroom, Travertine Marble
18 X 18 Travertine Marble over Schluter Deitra Waterproof Membrane
2 x 2 Travertine Mosaic Tile Floor over Schluter Deitra Waterproof Membrane
12 x 18 shower niche
Travertine Tub Surround Deck and Shower Glass, orders in motion. Vanities and Panel Knee Walls ordered by Client
Glass installed Friday May 25th, Travertine Deck installed earlier on Tuesday
Grouting Completed
2 x 2 Travertine Mosaic Tile Floor over Schluter Deitra Waterproof Membrane
12 x 18 shower niche
Travertine Tub Surround Deck and Shower Glass, orders in motion. Vanities and Panel Knee Walls ordered by Client
Glass installed Friday May 25th, Travertine Deck installed earlier on Tuesday
Grouting Completed
Thursday, 5 April 2012