Sunday, 28 October 2012

basement demos and electrical service relocation for future basement bathroom



High Park Kitchen Reno ongoing



 Old Windows completely torn out, including weight boxes
 Brick Arch supports the weight of the wall, no lintel

 2x4 walls added to the interior and Spray Foam Contractor came in and did a great job, now equal to R20 insulation value





 this is all gone now, angle iron lintels in old square windows remain


High Park Kitchen/Dining Renovation and basement demo work

 Heating Piping relocated and updated
 This is a solid brick house, no insulation at all, well, tar paper, foil backed plaster lath R 1 maybe

 this was the kitchen
 this wall is coming out


block support wall in the basement

Monday, 18 June 2012

New Neo-Angle, Tiled and Glass Wall Shower






ripped out an old tile shower and rebuilt it using hardie backer board, kerdie membrane and bottom pan and drain kit. Grouted and waiting for the Glass Order to be ready

Friday, 25 May 2012

New Cedar Top on and old deck

 half of the unseen structure needed to be replaced, dry rot, carpenter ants and wet
 we installed Grace Waterproof membrane on all joist tops to shed water and help preserve the deck joists


Thursday, 3 May 2012

Ensuite Bathroom, Travertine Marble

 18 X 18 Travertine Marble over Schluter Deitra Waterproof Membrane
 2 x 2 Travertine Mosaic Tile Floor over Schluter Deitra Waterproof Membrane
 12 x 18 shower niche
Travertine Tub Surround Deck and Shower Glass, orders in motion. Vanities and Panel Knee Walls ordered by Client
 Glass installed Friday May 25th, Travertine Deck installed earlier on Tuesday


 Grouting Completed