Friday 30 November 2012

This Project is almost complete

 There was a lot of cutting and odd angles, had me worried at first but it went really well and took quite a bit less time than I thought it would. The painting actually took longer than building the trusses and beams.

 I think this work turned out awesome. The client is very happy with the result of her "Vision"
 This was a very plain stippled(popcorn) ceiling a couple of weeks ago.




Saturday 17 November 2012

New job in Vaughan, Make My Room Cottage Like

 This was a plain vaulted and stippled ceiling. We cut LVL lumber and placed them on walls to support and will be installing tougue and groove bead boards on the ceiling. Boxing in beams with MDF and painting to come as well.

 We really want to get this done quickly so our client can enjoy a great Christmas in the new family room. It's already Nov 17th
 So far the customer feedback has been very nice!!!!


Sunday 28 October 2012

Turning a Hot Tub Room into an Art Studio

 new vanity, granite, taps, mirror, laminate and trim

 added a stainless sink and taps to the countertop

 new laminate, base and crown trim and lighting, fresh paint too

Project Completed, Backsplash and Painting Complete







Hickory Cabinets Manufactured by Big Sound Woodworks and installed by PureBuilt. Quartz Countertops Supplied and Installed by Continental Granite in Bolton




Turned a window into a classy door









 Indiana Limestone Door Sill from Leona Stone
 Aluminum Flashing from Buchner's in Newmarket

more High Park updates


 I couldn't believe how the foam made the wall so solid, built in moisture barrier and soundproof too


 range exhaust duct, straight outside
 porcelain tiles on hardie board

the service is ripped out from here and goes to the opposite end of the house

ongoing Kitchen work, wall gone and beam in place

 triple LVL beam on two columns, block wall below filled with mortar and blocking fills the joist cavities