Follow our Company

Sunday 28 October 2012

Turning a Hot Tub Room into an Art Studio

 new vanity, granite, taps, mirror, laminate and trim

 added a stainless sink and taps to the countertop

 new laminate, base and crown trim and lighting, fresh paint too

Project Completed, Backsplash and Painting Complete







Hickory Cabinets Manufactured by Big Sound Woodworks and installed by PureBuilt. Quartz Countertops Supplied and Installed by Continental Granite in Bolton




Turned a window into a classy door









 Indiana Limestone Door Sill from Leona Stone
 Aluminum Flashing from Buchner's in Newmarket

more High Park updates


 I couldn't believe how the foam made the wall so solid, built in moisture barrier and soundproof too


 range exhaust duct, straight outside
 porcelain tiles on hardie board

the service is ripped out from here and goes to the opposite end of the house

ongoing Kitchen work, wall gone and beam in place

 triple LVL beam on two columns, block wall below filled with mortar and blocking fills the joist cavities

















basement demos and electrical service relocation for future basement bathroom



High Park Kitchen Reno ongoing



 Old Windows completely torn out, including weight boxes
 Brick Arch supports the weight of the wall, no lintel

 2x4 walls added to the interior and Spray Foam Contractor came in and did a great job, now equal to R20 insulation value





 this is all gone now, angle iron lintels in old square windows remain